The Wifirst deployment factory

Wifirst relies on a precise and rigorous project methodology, based on experience acquired through the deployment of over 350,000 WiFi access points, 100,000 switches and 20,000 Internet links in France and abroad.

Three-phase project management: Think, Build & Run

THINK

001A09_Ampoule

Consulting &
AMOA

001G03_Audit

On-site network audit

001F03_Compass

Architectural design

001A10_Caddie

Technology selection

BUILD

002A03_Agenda

Panification & Project Management

002H04_Casque

Professional deployment

002B06_Maille

Integration into your ecosystem

002F04_Label

Acceptance, commissioning and VSR

RUN

003F05_24H

Supervision and multi-channel support

003F09_Configuration

Proactive and reactive maintenance

003H07_Cadenas

Cybersecurity and legal protection

003E09_Upload

Technology selection

In the course of our many large-scale LAN/WiFi and WAN projects, we have always applied the same rigor to the deployment phase, as this directly conditions the operability of the service, and ultimately its quality and customer satisfaction. Wifirst's ability to carry out large-scale deployments is based on several key success factors.

A scalable structure to cover many countries

Wifirst has maintained unrivalled flexibility and agility, thanks to its responsive structure and unique specialization in the WiFi operator business. This enables us to adapt our approach to the specific context of each customer, whether deploying an independent establishment or a fleet of several thousand sites.

This structure is supported in particular by human resources:

  • project management centralized around a team of qualified and experienced telecom project managers (a dedicated project manager is assigned to each new site)
  • an in-house team of several dozen WiFi-architects to carry out detailed technical studies prior to deployment
  • on-site installations carried out by a network of service providers trained and certified by our technical teams (over 400 partner integrator technicians).
map-world-2023-UK
APs

Adapted tools and procedures to industrialize deployment

Wifirst's teams have the technical resources needed to easily orchestrate the various components inherent in a deployment project (interactions with the customer, organization of interventions, equipment management, etc.):

  • A tailor-made project management tool, Wifirst Déploiement, to break down and track each stage of the project.
  • Audin, a tool for carrying out pre-visits and WiFi coverage studies, developed to compensate for the shortcomings of existing tools and directly connected to our information system.
  • A logistics platform to stock all the equipment required for deployment, sized to meet high volumes and precise deadlines.

The industrialization of our deployment processes and tools contributes directly to the success of our customers' projects, by optimizing the quality of installations and meeting deadlines, in a spirit of transparent communication.

A proven methodology for large-scale projects

Wifirst manages almost 1,500 simultaneous projects on a daily basis, enabling it to easily absorb high deployment rates for the most demanding projects in terms of number of sites. Our organization has enabled us to ensure successful deployments in record times and/or extreme conditions.

300

Hotels deployed in 3 months

logo_accor_hotels

600

Car centers deployed in 6 months

logo norauto

6 000

TV & Chromecast deployed

logo_appart_city

130

Stores deployed per month

Logo_Groupe_Les_Mousquetaires.svg

15

Sites in war zones

logo_ilopex

150

Agencies in 12 weeks

logo_maif